top of page
Low Resolution Logo - Black Background (1).png

Udanin
66mw Wind Farm

Lower Silesia Poland                                                                   

Wind Power Generation;

Minimum 66 Max 100 MW;

Above 3MWh/Y (P50 net per installed MW);

Last Mile stage - Ready to Build expected in Q4 2023;

Wind Resources: Total Output p.a. – 
Capacity Factor (P50) – 
Annual Production – P50
WTG Model: 
BOP Contractor
EPCM & TCM: YVS-CERAC Management,

Owner: YVS Renewable Energy CY
Local Developer: 
SPV: 

Low Resolution Logo - Black Background (1)_edited.jpg
Low Resolution Logo - Black Background (1)_edited.jpg
Low Resolution Logo - Black Background (1)_edited.jpg

Coming soon 

Coming soon

Coming soon

bottom of page