Udanin
66mw Wind Farm
Lower Silesia Poland
Wind Power Generation;
Minimum 66 Max 100 MW;
Above 3MWh/Y (P50 net per installed MW);
Last Mile stage - Ready to Build expected in Q4 2023;
Wind Resources: Total Output p.a. –
Capacity Factor (P50) –
Annual Production – P50 -
WTG Model:
BOP Contractor:
EPCM & TCM: YVS-CERAC Management,
Owner: YVS Renewable Energy CY
Local Developer:
SPV: